When surveyed under the City of Philadelphia Façade Inspection Ordinance, significant deficiencies were discovered in the 1989 LeBow Engineering Center exterior, located in the heart of Drexel University’s campus. TBS was selected to provide a full range of design and documentation services, as well as services during the execution of the required façade restoration work.